Project Engineer Position Available

Position:  Perform civil engineering services including creating industrial facility designs and structural specification that adhere to applicable regulation and codes; collaborate with automotive manufacturing and other companies to plan and develop engineering specification and cost estimates for plant facilities and expansion; inspect project sites to monitor progress and ensure adherence to engineering specifications, safety standards, and environmental regulations; complete load and grade requirements, power demands and usage rates and ensure code compliance; establish and maintain regulatory compliance plans and documentation.

Work Schedule: 9:00 am-6:00 pm. 40 hours/week (M-F)

Employer and Job Location: SBC Building Systems, LLC ~ Ambridge, Pennsylvania

Requirement: Master’s degree in Civil Engineering, Structural Engineering, or related field and 2 years of experience (or Bachelor’s degree + 5 years experience) in engineering design, analysis, and regulatory compliance for manufacturing facilities including cost estimations for international projects. Any suitable combination of education, training, and experience is acceptable.

Apply with resume to: SBC Building Systems, LLC , 360 14th Street, Ambridge, PA  15003 or eschmitz@sbcbldgsystems.com

 

SBC Building Systems Receives MBMA Safety Award

The Metal Building Manufacturers Association (MBMA) presented the Annual MBMA Safety Awards on May 12. Each year, the awards recognize metal building systems manufacturers that show exceptional commitment to assuring workplace safety.

SBC Building Systems LLC received the 2014 Safety Performance Award in recognition of having achieved an incident rate equal to 50% or better than the industry average as reported by OSHA.

MBMA has had a long-standing Safety Committee and Safety Awards Program, which was revamped in 2013 to increase the stringency of the awards so that companies with truly outstanding safety performance are recognized for their achievements.

 

 

 

Gillis Named Director of IT

Michael Gillis was hired as Director of Information Technology at SBC Building Systems. Mike’s background in IT spans nearly a decade of experience with several years in the non-residential pre-engineered steel building industry. Most recently he was a field engineer and project leader for LANTek.

Horse Barn Erected in Ohio

This horse barn was recently completed in Powell, Ohio.

cook horse barnIt features a 80′ x 80′ center section and lean to sections on each side. One is open and one is enclosed. The roof is an architectural SSR.

Staff Attends MBMA Meeting

SBC representatives, Sue Delo and Nicole Miller attended the fall MBMA meeting and participated in the working committee to prepare a new statistical report and measures manual.

Member companies use these industry reports to benchmark trends and activities in the marketplace. SBC has participated in the reporting for a number of years.

“It was refresher on reporting procedures, plus we discussed ways to increase participation from other members,” said Nicole.

“We always learn something new and suggest ways that we can improve a report,” added Sue.

Both agree that networking with other people in the business is a great way to share ideas and improve the industry.

Their recommendations will go the Board for final approval.

 

Winery Roof Makes A Statement In Mexico

SBC manufactured this special metallic color standing seam roof and wall liner system used on the inside of this building in Satillo Mexico. Square footage is 38,000 square feet.

The building will be used for winery production and storage of the wine.

 

Satillo Winery MX farSatillo MX winery inside

 

 

 

Welder/Fitters Needed

Must be able to read a tape measure and basic blue prints. Full benefits package after 90 days. Send resume or bring in person to SBC Building Systems, 360 14th St., Ambridge PA 15003. Attn: Sarah Blower or fax 724-266-8541.

 

Pasco Co Transfer Station Completed

RECYCLE TRANSFER STATIONIMG_0901IMG_0908

SHADY HILLS, FL

128’Wide x 106’Long x 36’-10” Eave Height, 1 ½ :12 roof slope.

PBR Roof with rigid board insulation, Plain Galvalume

PBR Walls

Standard Galvanized Purlins

Custom roof canopy over entrance door

Warehouse Phase One Completed

ECKLER INDUSTRIES, TITUSVILLE, FL

Warehouse/Distribution Center/Office Building

496’Wide x 349’Long x 30’ Eave Height, ¼:12 roof slope.

+ 60’ wide x 90’ Long x 14’ Height Entry building.

Trapezoidal SSR Roof, Plain Galvalume

Reversed Rolled PBR Walls

55’ Bay spacing used  50’ long joist on roof instead of standard purlins

Ground is now cleared for Phase Two Ecklers Warehouse 9-28-14 03addition.

Mark Construction served as erector.

Thank you to Dealers.

SBC Building Systems would like to thank the following Dealers and Sales Representatives along with their support staff for making our factory a success.

Although we have limited this list to our top 8, we wish to acknowledge and thank all of our dealers for continued success in 2014.

Click here to view – Top 8 Dealer Recognition 9.30.2014